Our first day back in NYC after the COVID-19 shutdown. We are installing glass rails in the two penthouses of this building on West 95th Street, NYC.
The contractor took all precautions to assure the health and safety of the subcontractors, including:
- Checking temperatures
- Multiple hand washing stations
- Limited people in elevator (only with co-workers)
- Keeping all different contractors in separate working areas
- Wearing our own masks and bringing hand sanitizer